Project: ____________________ Date: __________ Surveyor: ______________
| Check | Acceptance evidence | Pass / Fail / N/A | Remarks |
|---|---|---|---|
| Coordinate reference system and units confirmed | ________________ | ____________ | ____________ |
| Control point IDs and descriptions verified | ________________ | ____________ | ____________ |
| Instrument calibration and setup checked | ________________ | ____________ | ____________ |
| Independent control observations checked | ________________ | ____________ | ____________ |
| Horizontal and vertical closure evaluated | ________________ | ____________ | ____________ |
| Duplicate point IDs resolved | ________________ | ____________ | ____________ |
| Elevation datum and units verified | ________________ | ____________ | ____________ |
| Field codes and attributes validated | ________________ | ____________ | ____________ |
| Drawing layers and feature types reviewed | ________________ | ____________ | ____________ |
| Final files and revision metadata checked | ________________ | ____________ | ____________ |
Reviewed by: ____________________ Signature: ____________________
Blank working template. Project-specific tolerances must be set by the responsible surveyor.